ROCKY HILL FIRE DEPARTMENT
STANDARD OPERATING POLICY
Engine Hose Load Policy
Purpose: To provide a standard and uniform
arrangement for hose carried on the engines.
Scope: This policy applies to Engines 1,
2, 3, 4, and 6.
It shall be the responsibility of the company
captain to ensure adherence to this policy.
Procedure: The hose loads on all RHFD engines will be arranged so that they are substantially similar.
Crosslays
The front or top crosslay, will be equipped with the colored 1 3/4 “ hose lengths. Each front crosslay will have a 15/16” or 1” smoothbore nozzle.
The middle or lower cross-lay will have 1 ¾” high-combat hose with an SM-20 automatic nozzle attached.
The rear crosslay will have 2 ½’ hose with an SM-30 automatic nozzle.
Each crosslay shall be filled to capacity.
Rear Hose Beds.
Each engine shall have a 5” supply line, and the first length of 5 “supply line shall be 50 feet in length.
Each engine will have a 3” line of at least 600 feet in length which will have a 2 ½ x 1 ½ x 1 ½ gated wye on its end for use as a “Yard Line’
Each engine will have a 2-½-attack line of at least 300’ in length with a smoothbore stack-tip as the nozzle.
Additional beds will be equipped as appropriate.
Colored hose is assigned as follows:
Engine-1 White
Engine-2 Green
Engine-3 Yellow
Engine-4 Red
Engine-6 Blue
Hose Load Capacity is as follows:
ENGINE –1
1 ¾ Front Crosslay…..250 Feet
1 ¾ Mid Crosslay……250 Feet
2 ½ Crosslay…………350 Feet
5” Supply Line……….1150 Feet
3” Yard Line……….…900 Feet
2 ½ Attack Line………350 Feet
1 ¾ Rear Crosslay…….300 Feet
1 ¾ High Rise Pack…..150 Feet
1 ¾ High Rise Pack..…200 Feet
ENGINE –2
1 ¾ Top Crosslay…….250 Feet
1 ¾ Low Crosslay……200 Feet
2 ½ Crosslay…………250 Feet
1 ¾ Trash Line……….200 Feet
5” Supply Line……….1250 Feet
3” Yard Line………….200 Feet
2 ½ Attack Line………250 Feet
1 ¾ Rear Crosslay…….200 Feet
ENGINE –3
1 ¾ Top Crosslay…….200 Feet
1 ¾ Low Crosslay…….200 Feet
2 ½ Crosslay………….250 Feet
1 ¾ Trash Line……….150 Feet
5” Supply Line………..1350 Feet
3” Yard Line…………..600 Feet
2 ½ Attack Line……….650 Feet
1 ¾ High Rise Pack..…150 Feet
ENGINE –4
1 ¾ Front Crosslay……300 Feet
1 ¾ Mid Crosslay……..300 Feet
2 ½ Crosslay………….300 Feet
1 ¾ Trash Line………..150 Feet
5” Supply Line………1650 Feet
3” Yard Line……….…650 Feet
2 ½ Attack Line………300 Feet
1 ¾ High Rise Pack…...150 Feet
ENGINE –6
1 ¾ Front Crosslay…...250 Feet
1 ¾ Mid Crosslay…….300 Feet
2 ½ Crosslay………….300 Feet
1 ¾ Trash Line………..150 Feet
5” Supply Line……….1950 Feet
2 ½ Attack Line………950 Feet
1 ¾ High Rise Pack..…150 Feet
Truck -2
1 ¾ Front Crosslay..…300 Feet
1 ¾ Mid Crosslay…....300 Feet
2 ½ Crosslay…………350 Feet
5” Supply Line………1050 Feet
1 ¾ High Rise Pack….150 Feet
Truck
-3
1 ¾ Front Crosslay…150 Feet
1 ¾ Mid Crosslay…..150 Feet
5” Supply Line……..650 Feet
Date: 09-08
Proponent: RHFD Staff
Replaces: new