ROCKY HILL FIRE DEPARTMENT

 

STANDARD OPERATING POLICY

 

Engine Hose Load Policy

 

Purpose:           To provide a standard and uniform arrangement for hose carried on the engines.

                       

Scope:              This policy applies to Engines 1, 2, 3, 4, and 6.

 

It shall be the responsibility of the company captain to ensure adherence to this policy.

 

Procedure:        The hose loads on all RHFD engines will be arranged so that they are substantially similar. 

                       

                        Crosslays

 

                        The front or top crosslay, will be equipped with the colored 1 3/4 “ hose lengths.  Each front crosslay will have a 15/16” or 1” smoothbore nozzle.

 

                        The middle or lower cross-lay will have 1 ¾” high-combat hose with an SM-20 automatic nozzle attached.

 

                        The rear crosslay will have 2 ½’ hose with an SM-30 automatic nozzle.

 

Each crosslay shall be filled to capacity.

 

Rear Hose Beds.

 

Each engine shall have a 5” supply line, and the first length of 5 “supply line shall be 50 feet in length.

 

Each engine will have a 3” line of at least 600 feet in length which will have a 2 ½ x 1 ½ x 1 ½ gated wye on its end for use as a “Yard Line’

 

Each engine will have a 2-½-attack line of at least 300’ in length with a smoothbore stack-tip as the nozzle.

 

Additional beds will be equipped as appropriate.

 

 

 

 

Colored hose is assigned as follows:

Engine-1 White

Engine-2 Green

Engine-3 Yellow

Engine-4 Red

Engine-6 Blue

 

Hose Load Capacity is as follows:

 

ENGINE –1

1 ¾ Front Crosslay…..250 Feet

1 ¾ Mid Crosslay……250 Feet

2 ½ Crosslay…………350 Feet

           

5” Supply Line……….1150 Feet           

3” Yard Line……….…900 Feet            

2 ½ Attack Line………350 Feet

1 ¾ Rear Crosslay…….300 Feet

 

1 ¾ High Rise Pack…..150 Feet

1 ¾ High Rise Pack..…200 Feet

 

ENGINE –2

1 ¾ Top Crosslay…….250 Feet

1 ¾ Low Crosslay……200 Feet

2 ½ Crosslay…………250 Feet

1 ¾ Trash Line……….200 Feet

           

5” Supply Line……….1250 Feet           

3” Yard Line………….200 Feet            

2 ½ Attack Line………250 Feet

1 ¾ Rear Crosslay…….200 Feet

 

ENGINE –3

1 ¾ Top Crosslay…….200 Feet

1 ¾ Low Crosslay…….200 Feet

2 ½ Crosslay………….250 Feet

1 ¾ Trash Line……….150 Feet

           

5” Supply Line………..1350 Feet           

3” Yard Line…………..600 Feet            

2 ½ Attack Line……….650 Feet

                       

1 ¾ High Rise Pack..…150 Feet

 

 

 

            ENGINE –4

1 ¾ Front Crosslay……300 Feet

1 ¾ Mid Crosslay……..300 Feet

2 ½ Crosslay………….300 Feet

1 ¾ Trash Line………..150 Feet

           

5” Supply Line………1650 Feet           

3” Yard Line……….…650 Feet            

2 ½ Attack Line………300 Feet

 

1 ¾ High Rise Pack…...150 Feet

 

            ENGINE –6

1 ¾ Front Crosslay…...250 Feet

1 ¾ Mid Crosslay…….300 Feet

2 ½ Crosslay………….300 Feet

1 ¾ Trash Line………..150 Feet

           

5” Supply Line……….1950 Feet

2 ½ Attack Line………950 Feet

 

1 ¾ High Rise Pack..…150 Feet

 

            Truck -2

1 ¾ Front Crosslay..…300 Feet

1 ¾ Mid Crosslay…....300 Feet

2 ½ Crosslay…………350 Feet

 

5” Supply Line………1050 Feet

 

1 ¾ High Rise Pack….150 Feet

 

Truck -3

1 ¾ Front Crosslay…150 Feet

1 ¾ Mid Crosslay…..150 Feet

 

5” Supply Line……..650 Feet

 

Date: 09-08

Proponent:  RHFD Staff

Replaces: new